11/6/2009
5:00 PM
Today's Street Closure Permits
Street Name Dir From To Suf Start Date End Date Closure Type Details
115TH W 1500 1507 ST 11/05/09 11/06/09 Street Full Closure CLOSE 115TH STREET BRIDGE FROM MARSHFIELD TO ASHLAND TO POUR BRIDGE DECK. DETOUR TRAFFIC VIA:
(EASTBOUND) MARSHFIELD - 119TH - ASHLAND - 115TH
(WESTBOUND) ASHLAND - 11TH - MARSHFIELD - 115TH

NOVEMBER 5 (SCHEDULED DATE FOR BRIDGE POUR)
NOVEMBER 6 (RAIN DATE- STRICTLY BACK-UP DATE)
115TH W 1508 1599 ST 11/05/09 11/06/09 Street Full Closure  
115TH W 1600 1601 ST 11/05/09 11/06/09 Street Full Closure  
115TH W 1602 1612 ST 11/05/09 11/06/09 Street Full Closure  
115TH W 1613 1622 ST 11/05/09 11/06/09 Street Full Closure  
115TH W 1623 1653 ST 11/05/09 11/06/09 Street Full Closure  
115TH W 1654 1699 ST 11/05/09 11/06/09 Street Full Closure  
115TH W 1700 1721 ST 11/05/09 11/06/09 Street Full Closure  
26TH E 420 470 ST 07/01/09 12/31/09 Street Full Closure  
28TH W 400 425 ST 04/24/09 12/31/09 Street Full Closure CLOSE 28TH STREET EAST OF CANAL FOR VIADUCT REPAIRS
28TH W 426 443 ST 04/24/09 12/31/09 Street Full Closure  
28TH W 444 499 ST 04/24/09 12/31/09 Street Full Closure  
28TH W 500 500 ST 04/24/09 12/31/09 Street Full Closure  
29TH E 441 468 PL 07/01/09 12/31/09 Street Full Closure  
29TH E 441 499 ST 07/01/09 12/31/09 Street Full Closure  
29TH E 500 599 ST 07/01/09 12/31/09 Street Full Closure  
61ST E 1000 1099 ST 01/26/09 11/20/09 Street Full Closure FULL CLOSURE OF ELLIS WITHING WORK AREA
PROVIDE LOCAL ACCESS.
CLOSE ONE BLOCK AT A TIME.
61ST E 1100 1143 ST 01/26/09 11/20/09 Street Full Closure  
61ST E 1144 1199 ST 01/26/09 11/20/09 Street Full Closure  
61ST E 1200 1299 ST 01/26/09 11/20/09 Street Full Closure  
73RD W 1132 1199 ST 06/30/09 11/30/09 Street Full Closure FULL CLOSURE FOR 1132-1200 WEST 73RD STREET
INSTALLATION OF SEWER

OK G. WILLIAMS.
73RD W 1200 1200 ST 06/30/09 11/30/09 Street Full Closure  
93RD E 2600 2635 ST 03/31/09 11/30/09 Street Full Closure STREET CLOSURE IS ALLOWED ONE BLOCK AT A TIME.
FROM 93RD STREET FROM ANTHONY TO COLFAX.

OK G.WILLIAMS
93RD E 2636 2699 ST 03/31/09 11/30/09 Street Full Closure  
93RD E 2700 2799 ST 03/31/09 11/30/09 Street Full Closure  
93RD E 2800 2831 ST 03/31/09 11/30/09 Street Full Closure  
93RD E 2832 2838 ST 03/31/09 11/30/09 Street Full Closure  
96TH E 2435 2499 ST 01/06/09 11/30/09 Street Full Closure  
96TH E 2500 2531 ST 01/06/09 11/30/09 Street Full Closure  
96TH E 2532 2559 ST 01/06/09 11/30/09 Street Full Closure  
96TH E 2560 2613 ST 01/06/09 11/30/09 Street Full Closure  
96TH E 2614 2634 ST 01/06/09 11/30/09 Street Full Closure  
97TH E 2435 2633 ST 01/06/09 11/30/09 Street Full Closure OK G.W ILLIAMS.

CLOSE 96TH STREET & 97TH STREET FOR SEWER PROJECT.
ABERDEEN S 9000 9000 ST 11/06/09 12/06/09 Street Full Closure DETOUR LOCAL TRAFFIC
OK G.W ILLIAMS.
ADAMS W 501 501 ST 10/07/09 11/20/09 Street Full Closure MAINTAIN TWO LANE OF WESTBOUND LANE ON ADAMS AT ALL TIMES.

OK G.W ILLIAMS.
ADAMS W 3200 3299 ST 08/21/09 12/31/09 Street Full Closure  
ADAMS W 3300 3300 ST 08/21/09 12/31/09 Street Full Closure  
BENNETT S 7055 7059 AV 11/03/09 11/06/09 Street Full Closure  
BENNETT S 7060 7061 AV 11/03/09 11/06/09 Street Full Closure  
BENNETT S 7062 7099 AV 11/03/09 11/06/09 Street Full Closure  
BENNETT S 7100 7199 AV 11/03/09 11/06/09 Street Full Closure  
BEVERLY S 9900 9999 AV 05/18/09 12/31/09 Street Full Closure FULL CLOSURE OF BEVERLY FROM 99TH  TO 103RD STARTING 9AM, JUNE 15 UNTIL 5PM, JUNE 30, 2009 FOR WATER MAIN INSTALLATION. MAINTAIN ACCESS FOR LOCAL RESIDENTS.  DETOUR TRAFFIC VIA: BEVERLY - 103RD - VINCENNES - 99TH - BEVERLY.
BEVERLY S 10000 10099 AV 05/18/09 12/31/09 Street Full Closure  
BEVERLY S 10100 10199 AV 05/18/09 12/31/09 Street Full Closure  
BEVERLY S 10200 10299 AV 05/18/09 12/31/09 Street Full Closure  
CALIFORNIA S 3650 3699 AV 11/04/09 11/24/09 Street Full Closure CLOSE CALIFORNIA AT 37TH STREET UNDERNEATH THE CN VIADUCT STRUCTURE TO SANDBLAND AND PAINT VIADUCT STRUCTURE. CONTINUOUS CLOSURE 9AM, NOVEMBER 4 UNTIL 6AM, NOVEMBER 24, 2009. DETOUR TRAFFIC VIA: CALIFORNIA - PERSHING - ARCHER - WESTERN - 35TH - CALIFORNIA.

ALDERMAN OFFICE WRITTEN AN APPROVAL LETTER FOR CONTRACTOR'S FULL CLOSURE.

IN CONJUNCTION WITH PERMIT# 977181242
CALIFORNIA S 3700 3729 AV 11/04/09 11/24/09 Street Full Closure  
CICERO S 4000 4010 AV 11/02/09 11/08/09 Street Full Closure CLOSE CICERO AVENUE FOR AT GRADE TRACK RENEWAL SOUTH OF 39TH STREET (PERSHING ROAD).  DETOUR TRAFFIC VIA: CICERO - PERSHING - CENTRAL - 47TH ST - CICERO. CONTINUOUS CLOSURE STARTING 6:00AM, NOVEMBER 2, 2009 UNTIL NOON, NOVEMBER 8, 2009.
COTTAGE GROVE S 2939 2939 AV 07/01/09 12/31/09 Street Full Closure  
DAKIN W 5200 5299 ST 11/07/09 11/07/09 Block Party  
DIVISION W 829 829 ST 08/18/09 11/06/09 Street Full Closure MAINTAIN EASTBOUND TRAFFIC AT ALL TIMES***

CLOSE WESTBOUND DIVISION TO REPAIR SPRINGERS AND NEW GRATES. DETOUR WESTBOUND VIA: DIVISION - HALSTED - NORTH - ELSTON - DIVISION

(LOCAL DETOUR HOOKER STREET OR NORTH BRANCH)

CONTINUOUS CLOSURE 8:00AM, AUGUST 18 UNTIL OCTOBER 30, 2009

EXTEND CLOSURE UNTIL NOVEMBER 6, 2009
ELLIS S 2600 2699 AV 07/01/09 12/31/09 Street Full Closure  
ELLIS S 2700 2729 AV 07/01/09 12/31/09 Street Full Closure  
ELLIS S 2730 2799 AV 07/01/09 12/31/09 Street Full Closure  
ELLIS S 2800 2899 AV 07/01/09 12/31/09 Street Full Closure  
ELLIS S 2900 2909 AV 07/01/09 12/31/09 Street Full Closure  
ELLIS S 6000 6055 AV 03/01/09 11/20/09 Street Full Closure CLOSE ELLIS STREET FOR CRANE OPERATION DAILY FOR UNIVERSITY OF CHICAGO
ELLIS S 6100 6199 AV 01/26/09 11/20/09 Street Full Closure FULL CLOSURE OF ELLIS WITHING WORK AREA
PROVIDE LOCAL ACCESS.
CLOSE ONE BLOCK AT A TIME.

ELLIS S 6200 6299 AV 01/26/09 11/20/09 Street Full Closure  
ERIE E 122 135 ST 11/06/09 11/08/09 Street Full Closure DETOUR TRAFFIC: VIA MICHIGAN - SUPERIOR - FAIRBANKS

OK'D G. WILLIAMS
ERIE E 136 199 ST 11/06/09 11/08/09 Street Full Closure  
EUCLID S 7200 7200 AV 08/13/09 11/30/09 Street Full Closure 7200-7300 SOUTH EUCLID CLOSED FOR TWO DAY IN THE INTERSECTION
STARTING MONDAY OCTOBER 20TH, 2009 THRU OCTOBER 23RD, 2009
FIFTH W 3220 3260 AV 08/21/09 12/31/09 Street Full Closure  
GRAND E 1 33 AV 03/01/09 12/31/09 Street Full Closure REDUCE GRAND AVENUE TO TWO WESTBOUND LANES AS PART OF CTA SUBWAY RECONSTRUCTION. 24 HOUR CONTINUOUS CLOSURE.

PHASE 1: MARCH 31, 2008 UNTIL  DECEMBER 31, 2008 (TOTAL DURATION OF PROJECT CONTINUOUS UNTIL DECEMBER 2009

GRAND REMAIN TWO WESTBOUND LANES OF TRAFFIC FOR DURATION OF PROJECT.

** REDUCE GRAND AVENUE TO ONE WESTBOUND LANE FROM 10PM UNTIL 6AM, SUNDAYS THRU THURSDAYS. NO CLOSURE ON FRIDAY & SATURDAY NIGHTS**
ONE LANE CLOSURE FROM APRIL 1 THRU APRIL 15.

15 MINUTE FULL CLOSURE N/B STATE STREET TO UNLOAD STEEL AND MATERIAL ALLOWABLE HOURS ARE 9:30AM TO 11:00AM  AND 1:30PM  TO 3:00PM

JANUARY 12, 2009 (CRANE DEMOBLIZATION & MOBLIZATION)
** REDUCE GRAND AVENUE TO ONE WESTBOUND LANE FROM 10PM UNTIL 7AM.

15 MINUTE FULL CLOSURE N/B STATE STREET TO UNLOAD STEEL AND MATERIAL ALLOWABLE HOURS ARE 9:30AM TO 11:00AM , 1:30PM  TO 3:00PM & 4:00AM TO 7:00AM.


GRAND W 1 33 AV 03/01/09 12/31/09 Street Full Closure  
HALSTED S 3900 3999 ST 11/07/09 11/07/09 Street Full Closure CLOSE HALSTED SOUTH OF PERSHING TO POUR CONCRETE PILLARS FOR NORFOLK SOUTHERN YARD EXPANSION. DETOUR TRAFFIC VIA: HALSTED - PERSHING - MORGAN - EXCHANGE. ( BACK OF YARD COUNCIL WILL KEEP THE STOCK YARD GATES OPEN FOR THIS PROJECT)
HALSTED S 4000 4099 ST 11/07/09 11/07/09 Street Full Closure  
JACKSON W 360 399 BV 06/01/09 12/31/09 Street Full Closure CLOSE JACKSON BRIDGE OVER UNION STATION & CHICAGO FOR BRIDGE REHABILITATION.
CONTINUOUS CLOSURE FROM 9:30AM, JUNE 1, 2009 UNTIL APRIL 1, 2010.

DETOUR: JACKSON - CLINTON -HARRISON - WACKER - JACKSON
JACKSON W 400 411 BV 06/01/09 12/31/09 Street Full Closure  
JACKSON W 412 499 BV 06/01/09 12/31/09 Street Full Closure  
JACKSON W 500 539 BV 06/01/09 12/31/09 Street Full Closure  
LAFLIN S 1524 1543 ST 10/29/09 11/12/09 Street Full Closure CLOSE LAFLIN TO REMOVE VIADUCT STRUCTURE FROM 6AM, OCTOBER 29 UNTIL 5PM, NOVEMBER 12, 2009.
LAFLIN S 1544 1549 ST 10/29/09 11/12/09 Street Full Closure  
LAFLIN S 1550 1599 ST 10/29/09 11/12/09 Street Full Closure  
LAFLIN S 1600 1699 ST 10/29/09 11/12/09 Street Full Closure  
LAKE PARK S 2901 2999 AV 07/01/09 12/31/09 Street Full Closure FULL CLOSURE OF THE FOLLOWING STREETS TO SECURE THE DEMOLITION SITE OF MICHAEL REESE HOSPITAL:

2901 S - 3099 S LAKE PARK AVE
441 E - 626 E 29TH STREET
441 E - 468 E 29TH PLACE
2939 S - 2999 S COTTAGE GROVE
420 E - 470 E 26TH STREET
2600 S - 2909 S ELLIS
2720 S - 2800 S VERNON AVENUE

OK  PER TOM POWERS & MIKE SIMON

AMENDED ON JULY 29, 2009 TO EXTEND
VALID: AUG 1, 2009 - DEC 31, 2009
OK M SIMON
LAKE PARK S 3000 3098 AV 07/01/09 12/31/09 Street Full Closure  
LA SALLE S 2620 2699 ST 05/18/09 12/31/09 Street Full Closure CLOSE LASALLE STREET FROM 2800 S. TO 2600 S. TO RECONSTRUCT THE BRIDGE. PROVIDE EXPRESSWAY ACCESS ONLY AT LASALLE AND 31ST STREET. DETOUR NORTH LASALLE TRAFFIC VIA: LASALLE - 31ST - STATE - 26TH - WENTWORTH. 24 HOUR CONTINUOUS CLOSURE.
LA SALLE S 2700 2799 ST 05/18/09 12/31/09 Street Full Closure  
LA SALLE S 2800 2823 ST 05/18/09 12/31/09 Street Full Closure  
LUMBER S 1801 1830 ST 11/06/09 11/09/09 Street Full Closure CONTINUOUS CLOSURE OF LUMBER FROM 8PM, FRIDAY NOVEMBER 6 UNTIL 6:30AM, MONDAY NOVEMBER 9, 2009 TO REPAIR DAMAGE RAIL CROSSING. DETOUR TRAFFIC VIA: 18TH -CANAL - CERMAK.
LUNT W 2400 2499 AV 08/25/09 12/14/09 Street Full Closure CLOSE LUNT TO INSTALL NEW WATER MAIN. DETOUR TRAFFIC VIA: CALIFORNIA - TOUHY - WESTERN - LUNT.
LUNT W 2500 2599 AV 08/25/09 12/14/09 Street Full Closure  
LUNT W 2600 2699 AV 08/25/09 12/14/09 Street Full Closure  
LUNT W 2700 2799 AV 08/25/09 12/14/09 Street Full Closure  
LUNT W 2800 2899 AV 08/25/09 12/14/09 Street Full Closure  
MAY S 7200 7299 ST 06/30/09 11/30/09 Street Full Closure  
MAY S 7300 7300 ST 06/30/09 11/30/09 Street Full Closure  
MICHIGAN N 875 875 AV 11/07/09 11/07/09 Street Full Closure *** OK'D D. TAYLOR ***

LOCATION:  JOHN HANCOCK CENTER PLAZA

PERMISSION TO:  OCCUPY TRAFFIC LANE FOR 100FT.ON E/S OF N. MICHIGAN AV. TO
ERECT CRANE FOR WORK ON THE PLAZA.  100FT. BARRICADE.  MAINTAIN AT LEAST ONE
TRAFFIC LANE NORTH BOUND.

ALL TRAFFIC CONTROL WILL BE THE RESPONSIBILITY OF THE CONTRACTOR.

FLAGGERS WILLBE REQUIRED FOR TRAFFIC CONTROL - (CHRISTMAS TREE
INSTALLATION).
MICHIGAN LOWER N 250 299 AV 10/01/09 11/20/09 Street Full Closure SUB-CONTRACTOR: ATLANTIC PAINTING

WEEKEND FULL CLOSURE NORTHBOUND & SOUTHBOUND LOWER MICHIGAN  TO SANDBLASTING AND PAINTING BRIDGE STRUCTURE.

WEEKEND CLOSURE FROM 9PM, FRIDAY UNTIL 6AM, MONDAY
EXPECT OCTOBER 11DUE TO CHICAGO MARATHON TIMES ARE AS FOLLOW
9PM, FRIDAY UNTIL 11:59PM, SATURDAY & 9PM, SUNDAY UNTIL 6AM, MONDAY

NORTHBOUND DETOUR: LOWER MICHIGAN - COLUMBUS - GRAND - MICHIGAN
SOUTHBOUND DETOUR: LOWER MICHIGAN -NORTH WATER - ST. CLAIR - ILLINOIS-COLUMBUS - LOWER WACKER - LOWER MICHIGAN

AMEND CLOSURE TO NIGHTLY & WEEKENDS FULL CLOSURE (AMEND 10-6-09 G.W)
ADDITION (WEEKDAYS NIGHTLY CLOSURE) 8PM UNTIL 5AM, MONDAYS THRU FRIDAYS
ORLEANS N 1000 1027 ST 11/07/09 11/07/09 Block Party  
ORLEANS N 1028 1099 ST 11/07/09 11/07/09 Block Party ----CHURCH - BLOCK PARTY-----
PAXTON S 7055 7059 AV 11/03/09 11/06/09 Street Full Closure  
PAXTON S 7060 7061 AV 11/03/09 11/06/09 Street Full Closure  
PAXTON S 7062 7099 AV 11/03/09 11/06/09 Street Full Closure  
PAXTON S 7100 7199 AV 11/03/09 11/06/09 Street Full Closure  
PULASKI N 6000 6023 RD 10/28/09 11/25/09 Street Full Closure CONTINUOUS CLOSURE OF PULASKI FROM PETERSON (6000 N) TO ROGERS (6030 N) TO INSTALL SEWER MAIN.

DETOUR TRAFFIC VIA: PULASKI - FOSTER - CICERO - DEVON - PULASKI

(NO TRAAFIC IMPACTS CTA PULASKI ROUTE, CTA IS ALLOW UP TO TURN AROUND SOUTH OF PETERSON)
PULASKI N 6024 6099 RD 10/28/09 11/25/09 Street Full Closure  
RACINE S 7100 7130 AV 08/04/09 11/30/09 Street Full Closure  
RACINE S 7131 7199 AV 08/04/09 11/30/09 Street Full Closure  
RACINE S 7200 7230 AV 08/04/09 11/30/09 Street Full Closure  
RACINE S 7231 7299 AV 06/30/09 11/30/09 Street Full Closure  
RACINE S 7231 7299 AV 08/04/09 11/30/09 Street Full Closure  
RACINE S 7300 7300 AV 06/30/09 11/30/09 Street Full Closure  
RACINE S 7300 7330 AV 08/04/09 11/30/09 Street Full Closure  
RACINE S 7331 7399 AV 08/04/09 11/30/09 Street Full Closure  
RACINE S 7400 7400 AV 08/04/09 11/30/09 Street Full Closure  
RACINE S 12000 12099 AV 07/30/09 12/31/09 Street Full Closure  
RACINE S 12100 12199 AV 07/30/09 12/31/09 Street Full Closure PER MAUREEN WEST,  STREET  VACATION IS ON FILE AND UNDER REVIEW.   O.K. TO RELEASE PERMITS AS NEEDED WITH  THE  FOLLOWING  CONDITIONS.

   THERE ARE NO PERMANENT STRUCTURES ALLOWED ON THE PUBLIC RIGHT A WAY.


PURPOSE:  CLOSE RACINE FROM 120TH - 121 ST IN LIEU OF STREET VACATION PROCESS.

EXELON AND SUNPOWER ARE DEVELOPING NEW 10 MEGA WATT SOLAR SYSTEM ON ADJACENT PROPERTY.

(THIS IS A JOINT VENTURE WITH COMMONWEALTH EDISON/EXELON & SUNPOWER CORPORATION)
RIDGELAND S 7055 7104 AV 11/03/09 11/06/09 Street Full Closure CLOSE AT-GRADE CROSSING TO REPAIR SIGNALING SYSTEM. CONTINUOUS CLOSURE FROM 8AM, TUESDAY NOVEMBER 3 UNTIL 4PM, FRIDAY NOVEMBER 6, 2009.

CLOSE THE AT-GRADE METRA CROSSING AT RIDGELAND, BENNETT, & PAXTON ALONG 71ST ST.
ROOT W 100 113 ST 04/08/09 12/31/09 Street Full Closure 24 HOUR CONTINUOUS CLOSURE OF ROOT STREET FOR BRIDGE RECONSTRUCTION
ROOT W 114 118 ST 04/08/09 12/31/09 Street Full Closure  
ROOT W 119 128 ST 04/08/09 12/31/09 Street Full Closure  
ROOT W 129 134 ST 04/08/09 12/31/09 Street Full Closure  
ROOT W 135 148 ST 04/08/09 12/31/09 Street Full Closure  
ROOT W 149 152 ST 04/08/09 12/31/09 Street Full Closure  
ROOT W 153 199 ST 04/08/09 12/31/09 Street Full Closure  
ROOT W 200 224 ST 04/08/09 12/31/09 Street Full Closure  
RUSH N 400 407 ST 10/15/09 11/20/09 Street Full Closure CLOSE RUSH  FOR INSTALLING STONE
RUSH N 408 429 ST 10/15/09 11/20/09 Street Full Closure  
RUSH N 430 499 ST 10/15/09 11/20/09 Street Full Closure  
RUSH N 500 527 ST 10/15/09 11/20/09 Street Full Closure  
STATE N 400 429 ST 03/01/09 12/31/09 Street Full Closure PHASE 1: MARCH 31, 2008 UNTIL DECEMBER 31, 2008 (TOTAL DURATION OF PROJECT CONTINUOUS UNTIL DECEMBER 2009.

PHASE 1: CLOSE SOUTHBOUND STATE AT GRAND, DETOUR SOUTHBOUND STATE VIA: STATE - GRAND - CLARK - ILLINOIS. PHASE 1 CONTINUOUS UNTIL TIL APPROXIMATELY NOVEMBER 2008. MAINTAIN ONE NORTHBOUND LANE ON STATE STREET FOR THE DURATION OF THE PROJECT.


** REDUCE GRAND AVENUE TO ONE WESTBOUND LANE FROM 10PM UNTIL 6AM, SUNDAYS THRU THURSDAYS. NO CLOSURE ON FRIDAY & SATURDAY NIGHTS**
ONE LANE CLOSURE FROM APRIL 1 THRU APRIL 15.

STATE N 430 499 ST 03/01/09 12/31/09 Street Full Closure  
STATE N 500 529 ST 03/01/09 12/31/09 Street Full Closure  
STATE N 530 599 ST 03/01/09 12/31/09 Street Full Closure  
STATE N 600 600 ST 03/01/09 12/31/09 Street Full Closure PHASE 3: CLOSE SOUTHBOUND STATE BETWEEN OHIO AND ILLINOIS, DETOUR SOUTHBOUND STATE VIA: STATE - ONTARIO - CLARK - WACKER. PHASE 3 CONTINUOUS UNTIL TIL APPROXIMATELY APRIL 2010. MAINTAIN ONE NORTHBOUND LANE ON STATE STREET FOR THE DURATION OF THE PROJECT.
TORRENCE S 9700 9700 AV 01/06/09 11/30/09 Street Full Closure FULL CLOSURE OF THE INTERSECTION OF 97TH STREET AND TORRENCE.
VAN BUREN W 200 299 ST 10/10/09 11/20/09 Street Full Closure FULL STREET CLOSURE
VAN BUREN FROM WELLS TO FRANKLIN

REROUTE WELLS, HARRISON BACK TO HARRISON TO FRANKLIN

OK G. WILLIAMS.
VAN BUREN W 300 350 ST 10/10/09 11/20/09 Street Full Closure  
VERNON S 2730 2759 AV 07/01/09 12/31/09 Street Full Closure  
VINCENNES S 4300 4399 AV 05/13/09 11/30/09 Street Full Closure  
VINCENNES S 4400 4429 AV 05/13/09 11/30/09 Street Full Closure  
VINCENNES S 4430 4499 AV 05/13/09 11/30/09 Street Full Closure  
VINCENNES S 4500 4531 AV 05/13/09 11/30/09 Street Full Closure  
VINCENNES S 4532 4599 AV 05/13/09 11/30/09 Street Full Closure  
VINCENNES S 4600 4633 AV 05/13/09 11/30/09 Street Full Closure FULL CLOSURE OF VINCENNES FROM 4300 SOUTH TO 4700 SOUTH
FOR SEWER PROJECT IN THE MIDDLE OF ROADWAY.
WILL LEAVE ONE LANE OPEN FOR EMEGENCY VEHICLES ONLY

OK G. WILLIAMS.
VINCENNES S 4634 4699 AV 05/13/09 11/30/09 Street Full Closure  
VINCENNES S 4700 4799 AV 05/13/09 11/30/09 Street Full Closure  
WABASH S 600 600 AV 01/19/09 11/20/09 Street Full Closure FULL STREET CLOSURE OF HARRISON EAST OF WABASH TO CONNECT TO WATER MAIN. PROVIDE LOCAL ACCESS BETWEEN FROM WABASH TO MICHIGAN.  DETOUR TRAFFIC VIA: MICHIGAN - BALBO - STATE - HARRISON.  FEBRUARY 9 UNTIL FEBRUARY 13, 2009 (CONTINUOUS CLOSURE)